First soup installation for this ANTAI customer, HEFEI province (CHINA) with a building of 6,000 fattening places from 25 to 120 kg.
This building is equipped with an MD2 system with 2 rotomoulded 3000L distribution preparation tanks as well as a separation tank to clean the circuits after each distribution.
192 Membran valves allow to distribute the soup in the double troughs. All installation is controlled with MULTIFEEDER software.
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7363-1-1024x683.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7357-1.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7362-1-1024x683.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7364-1.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7358-1.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7353-1.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7451-1.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7352-1.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7450-1.jpg)
![](https://www.asserva.com/wp-content/uploads/2023/01/IMG_7351-1-scaled.jpg)