We have just completed the full renovation of the liquid feeding system with the implementation of an MD2 system for feeding 7,500 finishing places.
👉 A 16,000 L pre-mix tank and two 2,800 L stainless steel tanks have been installed, along with the replacement of silos to ensure performance and reliability.
A great project carried out with our long-standing client, who once again places his trust in Asserva. 🙏




